Skip to main content
All Permits/Florida/Palm Beach County
Florida · FL

Palm Beach County, Florida Plumbing & Roofing & Electrical & HVAC Permit Requirements

Complete Plumbing, Roofing, Electrical, HVAC permit requirements for contractors working in Palm Beach County, Florida. Includes fees, processing times, inspections, application method, and source links where available.

This information is summarized from publicly available sources for reference only. PullReady is not affiliated with any government agency. Always verify current requirements with the county building department before submitting.

Plumbing Permits

Updated Apr 14, 2026

Fees & Submission

Base Permit FeeBased on construction valuation: $75 minimum (up to $2,000); + 2.50% on next $8,000; + 1.75% on next $90,000; + 1.00% on next $200,000; + 0.75% on remainder
Submission Method🌐 Online Portal
Processing Time3–5 business days (residential); 10–15 business days (commercial)
Inspections Required2 inspections

Data Source

Palm Beach County Building Permits

✓ Public data sourceView permit requirements

Last reviewed: Apr 14, 2026

PullReady provides summarized public information for reference only. Always verify requirements with the official local authority before applying.

Insurance & Bonding

Min. General Liability$300,000 per occurrence
Workers Comp Required Yes
Workers Comp Min.Statutory limits per Florida law
Bond Required No
Local License Required No
Inspection StagesRough-in/Underground, Final

Required Documents

  • Completed permit application
  • State-certified plumbing contractor license
  • Proof of general liability insurance
  • Proof of workers’ compensation insurance or exemption
  • Signed plans (commercial/new construction)
  • Notice of Commencement

Important Notes

Fees per Palm Beach County PZB Construction Permit Fee Schedule (Exhibit A). Fee based on construction valuation: $75 flat for work up to $2,000; plus 2.50% on next $8,000; plus 1.75% on next $90,000; plus 1.00% on next $200,000; plus 0.75% on all remainder. Minimum fee $75. State-certified license accepted — no separate local county license required.

This Permit Data Is Locked

Missing one requirement can delay your permit for weeks.

Delays can cost $500–$3,000 per job.

  • Exact required documents for this permit
  • Step-by-step submission process
  • Inspection requirements by county
  • Avoid costly rejections the first time
Unlock Permit Requirements

See exactly what to submit before you go.

Roofing Permits

Updated Apr 14, 2026

Fees & Submission

Base Permit FeeNew roofing: based on construction valuation ($75 minimum). Residential re-roofing: based on valuation. Repairs under 2 squares / under $2,500 value: $75 flat
Submission Method🌐 Online Portal
Processing Time3–5 business days (residential); 10–15 business days (commercial)
Inspections Required2 inspections

Data Source

Palm Beach County Building Permits

✓ Public data sourceView permit requirements

Last reviewed: Apr 14, 2026

PullReady provides summarized public information for reference only. Always verify requirements with the official local authority before applying.

Insurance & Bonding

Min. General Liability$300,000 per occurrence
Workers Comp Required Yes
Workers Comp Min.Statutory limits per Florida law
Bond Required No
Local License Required No
Inspection StagesDry-in, Final

Required Documents

  • Completed permit application
  • State-certified roofing contractor license
  • Proof of general liability insurance
  • Proof of workers’ compensation insurance or exemption
  • Product approval numbers for roofing materials
  • Notice of Commencement
  • Signed and sealed drawings (commercial)

Important Notes

Fees per Palm Beach County PZB Construction Permit Fee Schedule (Exhibit A). Fee based on construction valuation: $75 flat for work up to $2,000; plus 2.50% on next $8,000; plus 1.75% on next $90,000; plus 1.00% on next $200,000; plus 0.75% on all remainder. Minimum fee $75. State-certified license accepted — no separate local county license required.

This Permit Data Is Locked

Missing one requirement can delay your permit for weeks.

Delays can cost $500–$3,000 per job.

  • Exact required documents for this permit
  • Step-by-step submission process
  • Inspection requirements by county
  • Avoid costly rejections the first time
Unlock Permit Requirements

See exactly what to submit before you go.

Electrical Permits

Updated Apr 14, 2026

Fees & Submission

Base Permit FeeBased on construction valuation: $75 minimum (up to $2,000); + 2.50% on next $8,000; + 1.75% on next $90,000; + 1.00% on next $200,000; + 0.75% on remainder
Submission Method🌐 Online Portal
Processing Time3–5 business days (residential); 10–15 business days (commercial)
Inspections Required3 inspections

Data Source

Palm Beach County Building Permits

✓ Public data sourceView permit requirements

Last reviewed: Apr 14, 2026

PullReady provides summarized public information for reference only. Always verify requirements with the official local authority before applying.

Insurance & Bonding

Min. General Liability$300,000 per occurrence
Workers Comp Required Yes
Workers Comp Min.Statutory limits per Florida law
Bond Required No
Local License Required No
Inspection StagesRough-in, Service/Panel, Final

Required Documents

  • Completed permit application
  • State-certified electrical contractor license
  • Proof of general liability insurance
  • Proof of workers’ compensation insurance or exemption
  • Signed and sealed plans (commercial)
  • Notice of Commencement

Important Notes

Fees per Palm Beach County PZB Construction Permit Fee Schedule (Exhibit A). Fee based on construction valuation: $75 flat for work up to $2,000; plus 2.50% on next $8,000; plus 1.75% on next $90,000; plus 1.00% on next $200,000; plus 0.75% on all remainder. Minimum fee $75. State-certified license accepted — no separate local county license required.

This Permit Data Is Locked

Missing one requirement can delay your permit for weeks.

Delays can cost $500–$3,000 per job.

  • Exact required documents for this permit
  • Step-by-step submission process
  • Inspection requirements by county
  • Avoid costly rejections the first time
Unlock Permit Requirements

See exactly what to submit before you go.

HVAC Permits

Updated Apr 14, 2026

Fees & Submission

Base Permit FeeA/C change-out (residential): $100 flat; A/C change-out (commercial): $150 per 10 units. New HVAC with ductwork: based on valuation ($75 minimum)
Submission Method🌐 Online Portal
Processing Time3–5 business days (residential); 10–15 business days (commercial)
Inspections Required2 inspections

Data Source

Palm Beach County Building Permits

✓ Public data sourceView permit requirements

Last reviewed: Apr 14, 2026

PullReady provides summarized public information for reference only. Always verify requirements with the official local authority before applying.

Insurance & Bonding

Min. General Liability$300,000 per occurrence
Workers Comp Required Yes
Workers Comp Min.Statutory limits per Florida law
Bond Required No
Local License Required No
Inspection StagesRough-in, Final

Required Documents

  • Completed permit application
  • State-certified mechanical contractor license
  • Proof of general liability insurance
  • Proof of workers’ compensation insurance or exemption
  • Equipment specifications and load calculations
  • Notice of Commencement

Important Notes

Fees per Palm Beach County PZB Construction Permit Fee Schedule (Exhibit A). Fee based on construction valuation: $75 flat for work up to $2,000; plus 2.50% on next $8,000; plus 1.75% on next $90,000; plus 1.00% on next $200,000; plus 0.75% on all remainder. Minimum fee $75. State-certified license accepted — no separate local county license required.

This Permit Data Is Locked

Missing one requirement can delay your permit for weeks.

Delays can cost $500–$3,000 per job.

  • Exact required documents for this permit
  • Step-by-step submission process
  • Inspection requirements by county
  • Avoid costly rejections the first time
Unlock Permit Requirements

See exactly what to submit before you go.

Frequently Asked Questions — Palm Beach County Permits

How much does a Plumbing permit cost in Palm Beach County, Florida?

The base Plumbing permit fee is Based on construction valuation: $75 minimum (up to $2,000); + 2.50% on next $8,000; + 1.75% on next $90,000; + 1.00% on next $200,000; + 0.75% on remainder. Additional valuation-based fees may apply — verify current amounts with the building department.

How much does a Roofing permit cost in Palm Beach County, Florida?

The base Roofing permit fee is New roofing: based on construction valuation ($75 minimum). Residential re-roofing: based on valuation. Repairs under 2 squares / under $2,500 value: $75 flat. Additional valuation-based fees may apply — verify current amounts with the building department.

How long does it take to get a Plumbing permit in Palm Beach County?

Plumbing permits in Palm Beach County typically take 3–5 business days (residential); 10–15 business days (commercial). Timelines may vary based on submission volume and application completeness.

How many inspections are required for a Plumbing permit in Palm Beach County?

Palm Beach County requires 2 inspections for Plumbing permits. Required stages may include: Rough-in/Underground, Final.

What documents do I need for a Plumbing permit in Palm Beach County?

Plumbing permit applications in Palm Beach County typically require: Completed permit application; State-certified plumbing contractor license; Proof of general liability insurance; Proof of workers’ compensation insurance or exemption. Verify the complete checklist with the building department before applying.

Can I apply for a Plumbing permit online in Palm Beach County?

Yes, Palm Beach County accepts Plumbing permit applications online. Use the county building department's portal when submitting.

What insurance is required for a Plumbing permit in Palm Beach County?

General liability insurance of at least $300,000 per occurrence is typically required. Workers compensation coverage is also required. Verify exact coverage requirements with the building department.